Oct. 13, 2014A READER ASKS: Our small co-op is undertaking a façade restoration, and we're wondering if we should include the balconies within the scope of work. Many of the balconies have cracks and stains, and some have what look like icicles on the undersides that drip water. In addition, the metal railings are showing signs of wear. Most of our balconies are covered with an artificial turf and have aluminum covers along the edges, so we're hesitant to rip up everything if we can get by with fixing the loose railings and patching the undersides. What should we do?

HABITAT ANSWERS: A full-scale balcony repair program is a major project and one that should not be ignored. If most of your building's balconies are in the condition you describe, the board will probably have to bite the bullet and undertake this project. The defects you note are significant, especially if they are widespread. 

The "icicles" are calcium carbonate deposits that form as water drips from the balcony slab. They're a sign of substantial, longstanding water penetration, which could also indicate possible damage to the structural steel supporting the balcony. The loose railings, which are a safety hazard as well as a code violation, are also a result of water infiltration.

Investigate

To determine how extensive the deterioration is and what types of repairs are necessary, the first step is to hire an engineer or architect to conduct a thorough survey. He or she will determine the most badly damaged areas and if the balconies are structurally sound.

As part of the survey, the engineer/architect may request investigative probes of the concrete (conducted by a contractor) to determine underlying conditions. Probes will determine if the steel reinforcement is rusted, which could lead to structural weakness. Based on the survey findings, the engineer/architect will recommend whether a full-scale repair program is needed or if limited repairs will suffice.

In your building's case, a balcony repair program would probably entail extensive concrete repairs and the installation of new railings. If the balconies are extremely damaged, they may need to be demolished and rebuilt.

Ameliorate

In order for the contractor to repair the concrete properly, the defective areas must be entirely cut away. The cuts should be straight, not beveled or tapered, and the cut surfaces must then be scarified and a bonding agent applied so the new concrete properly adheres to old. If missing, a drip edge should be made to help direct dripping water away from the building.

Loose, rusted railings should be repaired or replaced depending on the severity of the deterioration. Railing posts will have to be removed from the concrete, and the defective concrete surrounding them cut away. It is recommended that the posts be inserted into stainless steel sleeves or sleeve openings that are then filled with epoxy.

Since the building will be undertaking a façade restoration program, it makes sense to incorporate the balcony work as part of the overall repair program to avoid paying twice for mobilization and scaffold costs. 

 

For more, see our Site Map or join our Archive >>

Subscribe

join now

Got elected? Are you on your co-op/condo board?

Then don’t miss a beat! Stories you can use to make your building better, keep it out of trouble, save money, enhance market value, and make your board life a whole lot easier!