New roof, any thoughts as to the appropriate roofing systemOct 03, 2008


Yes, we shall employ a suitable engineering firm to write the specifications to replace our roof. It is a flat 32,000 sq. ft. roof that has 36 waste pipe penetrations and are 36 air vent penetrations with exhaust fans (these vent kitchens and bathrooms).

May I have your feedback as to the efficacy and any issues posed by:
1. hot tar systems
2. cold tar systems
3. membrane systems.

Thanks much

Join the Conversation Comments (3)
Above by Jimmy (nm) - Jimmy Oct 03, 2008



Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Introduce yourself to other members of Board Talk! Login below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Register

Forgot your password? Click here

> Join the conversation Comments (2)
Coal tar, not cold tar, so much for the spell checker (nm) - Jimmy Oct 03, 2008



Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Introduce yourself to other members of Board Talk! Login below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Register

Forgot your password? Click here

> Join the conversation
BEWARE - sal Oct 08, 2008


be careful to go with a company that has been around a long time. Many "roofing co's" change their name every few years so they dont have to honor warranties. Also, do NOT go to co's recommended by your managing agent - do your own research. Seriously, this is true.

Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Introduce yourself to other members of Board Talk! Login below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Register

Forgot your password? Click here

> Join the conversation
Re: New roof, any thoughts as to the appropriate roofing system - Joseph shkreli Oct 04, 2008


I am Resident Manager, and at my previous when i was a working superintendent we had to have our flat roof redone. The cheapest way is not always the best way. I like (Synthetic Membranes). The use of synthetic membranes has just about eliminated the need for gravel on roofs. Why? Because many of these new roof membranes are glued down to the roof sheathing. Not only that, the new membranes contain materials that resist UV degradation. If you can install a new flat roof without gravel, do it!

Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Introduce yourself to other members of Board Talk! Login below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Register

Forgot your password? Click here

> Join the conversation Comments (1)
roof - RLM Oct 05, 2008


We had a new roof installed about 4 years ago now - cold-rolled (synthetic membrane). Lots of protruding pipes. Process was smooth sailing and we have at least a 20-year warranty.

Be happy to give you more info if you're interested.

Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Introduce yourself to other members of Board Talk! Login below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Register

Forgot your password? Click here

> Join the conversation
Engineering opinion - AdC Oct 11, 2008


If you are employing an engineering company for the replacement, these are the individuals whose brains should be picked. Ask why they favor one type of roof over another, etc. Also, what you discuss initially with the engineer will probably drive to a great extent the selection of the roof. If someone is looking for a green roof, then the engineer will recommend the green roof or will tell you why he/she does not favor it for your specific structure. If you say, you do not have much money to spend on your roof, your deck may be overlooked to a great extent and he/she may try to get a second layer if possible at a lesser cost.

Again, engineers will do the recommendation based on the prelliminary study and based on your initial conversation to ensure that the work that they will finally sign off pleases the customer and the budget. No sense in designing a rolls royce if you can only pay for a chevy.

AdC

Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Introduce yourself to other members of Board Talk! Login below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Register

Forgot your password? Click here

> Join the conversation

Introduce yourself to other members of Board Talk! Log in below or register here.

Board Talk members who registered prior to March 9th, 2016 will need to reset their password.

Introduce yourself to other members of Board Talk! Login below or register here.
Board Talk members who registered prior to March 9th, 2016 will need to reset their password.
Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.